Your trench should be between 750mm and 1.350m deep.
The trench should be free from any debris that may damage the pipe and should be wide enough (350mm) to accommodate the pipework.
Service pipes and ducts shall be laid in straight runs to the agreed location. They should not cross neighbouring building plots.
If your pipe work or the connection is due to take place within private land, you will need to liaise with the landowner and obtain their written consent for excavating/laying your pipe. We will also need a copy of this consent prior to us making the connection.
The pipe should be surrounded by sand or fine material. The trench can then be backfilled with soil, which must be free from rubble and domestic or commercial waste.
If you plan on backfilling your trench or if this is a long pipework length so you backfill as you go along, we must be able to see inspection pits along the pipework run – especially at the start, middle and end.
You should also take photographs of the trench and pipework prior to any backfilling.